PROJECT
Reagent Turnkey Dosing Station
INDUSTRY
Mining
LOCATION
Hunter Valley, NSW Australia
EQUIPMENT
2x Double- sided, Custom Designed dosing pump cabinets for hazardous and Non-hazardous fluids, 1x motor Control cabinet
DURATION
9 months
VALUE
$1 Million
Aqua Energy Group were engaged to design, supply, install & commission a complete Reagent Plant to suit our clients requirements. This Project utilises two double sided pump cabinets with a mixture of hazardous–rated and standard dosing pumps to pump set amount of liquid into the thickening plant on site. These cabinets are accompanied by a customised switchboard for full operation of the units. Two large 40FT containerised Fuel storage units were supplied as part of our package, flow-monitoring, all lighting, and complete installation project.
CHALLENGES
Aqua Energy Group was able to navigate very strict environmental requirements and tight timeframe for the customer to get their new coal fines handling plant up and operation ASAP.
Find Us
NSW Office: 21 Kalinya Close, Cameron Park NSW 2285
QLD Office: 16 Silverton Court Paget QLD 4740
WA Office: 58 Catalano Circuit, Canning Vale WA 6155