PROJECT
NSW Water Utilities Drought Relief
INDUSTRY
Infrastructure
LOCATION
Inland, NSW Australia
EQUIPMENT
Containerised Switch rooms, 415V
MCC, 2 x pontoons, 6xpumps @660L/s
each Pump, Pipelines/ Valving
DURATION
6 months
VALUE
$3.8 Million
The Project Included the Design, supply, and delivery of two pontoons delivering up to 300ML a day of Freshwater to a coffer dam arrangement. The Project also consists of a 415V Containerised Switch room, heavy-duty trailing cable, and a flexi DN600 pipeline arrangement for the two pontoons. This project was a full D&C by the Aqua Energy Group Engineering team.
CHALLENGES
This Project was won by Aqua Energy Group on the merit that we could supplu a complete drought relief package in a short time frame. We are proud that we could not only deliver the project in the time frame specified, but we were also able to use all Australian made products.
Find Us
NSW Office: 21 Kalinya Close, Cameron Park NSW 2285
QLD Office: 16 Silverton Court Paget QLD 4740
WA Office: 58 Catalano Circuit, Canning Vale WA 6155