NSW WATER UTILITIES DROUGHT RELIEF

Mar 05, 2024
NSW

PROJECT

NSW Water Utilities Drought Relief


INDUSTRY

Infrastructure


LOCATION

Inland, NSW Australia


EQUIPMENT

Containerised Switch rooms, 415V

MCC, 2 x pontoons, 6xpumps @660L/s

each Pump, Pipelines/ Valving


DURATION

6 months


VALUE

$3.8 Million


The Project Included the Design, supply, and delivery of two pontoons delivering up to 300ML a day of Freshwater to a coffer dam arrangement. The Project also consists of a 415V Containerised Switch room, heavy-duty trailing cable, and a flexi DN600 pipeline arrangement for the two pontoons. This project was a full D&C by the Aqua Energy Group Engineering team.


CHALLENGES

This Project was won by Aqua Energy Group on the merit that we could supplu a complete drought relief package in a short time frame. We are proud that we could not only deliver the project in the time frame specified, but we were also able to use all Australian made products.